Ronald A. Weist
Network Engineer Candidate
Network Experience | Hardware Experience | Software Experience | Home | Network Diagrams | Scopes of Work | Internal Proposals |
Customer Scopes of Work
Intrusion Detection System | Packeteer Packetshaper | Network Sniffer |
Dial Backup Scope | Line Upgrade | Site-to-site PIX VPN Scope |
Dial Backup Scope of Work
Logo Removed
|
Address Removed
City, State Zip Removed Phone Number Removed Fax Number Removed |
|
Date
|
Disaster Recovery
Center
DBU Communications
Scope Of Work
II.
Test
Dialup Communications
III.
Assist
with Full Test to DRC
A. Host Site
i.
Evaluate
IOS compatibility with WIC-2T and NM-2W
ii.
Upgrade
IOS if necessary
1. May require additional flash and/or DRAM
iii.
Install
Hardware
iv.
Set up
additional DLCI numbers for secondary PVCs
v.
Connect
ISU 512 to Port
vi.
Setup
additional routes for redundancy and disaster recovery
i.
Evaluate
IOS compatibility with WIC-2T
ii.
Upgrade
IOS if necessary
1. May require additional flash and/or DRAM
iii.
Install
Hardware
iv.
Set up
additional DLCI numbers for secondary PVCs
v.
Connect
ISU 512 to Port
vi.
Setup
additional routes for redundancy and disaster recovery
i.
Evaluate
IOS compatibility with WIC-2T
ii.
Upgrade
IOS if necessary
1. May require additional flash and/or DRAM
iii.
Install
Hardware
iv.
Set up
additional DLCI numbers for secondary PVCs
v.
Connect
ISU 128 to Port
vi.
Setup
additional routes for redundancy and disaster recovery
i.
Set up
additional DLCI numbers for secondary PVCs
ii.
Setup
additional routes for redundancy and disaster recovery
II.
Test
Dialup Communications
Customer
is responsible to order necessary ISDN lines and additional PVCs for circuit
redundancy. Remember to have a long
distance carrier assigned to the ISDN lines.
Customer must provide the
necessary network addressing and protocol information prior to equipment
configuration.
Customer must provide the necessary
circuit provisioning information prior to router configuration.
Customer must provide the
necessary information required for any software configuration.
Customer is responsible for
scheduling circuit turn-up with the circuit provider. However, We can act as
liaison with the circuit provider at Customer request.
Customer is responsible for
providing a sufficient space in the Computer Room for the installation of the
new equipment.
Customer is responsible for
providing a sufficient number of power outlets to run the equipment. These
outlets should be isolated from an electrical circuit that may create
electronic interference with data communications equipment.
Customer is also responsible
for providing the appropriate operating environment for these products as
described by the manufacturer of the equipment.
EXCLUSIONS:
All work to be done within
normal business hours (Monday to Friday, 8:00am to 5:00pm). Projects requiring
labor outside of these hours will be charged at a premium overtime rate.
This Scope of Work has been agreed to and accepted by:
(Client Signature)
(Print here)
(Engineer Signature)
(Print here)